{"id":4865,"date":"2026-06-03T15:49:26","date_gmt":"2026-06-03T14:49:26","guid":{"rendered":"https:\/\/www.cozynotes.cz\/?p=4865"},"modified":"2026-06-03T15:56:32","modified_gmt":"2026-06-03T14:56:32","slug":"tak-nam-schvalili-planovaci-smlouvu","status":"publish","type":"post","link":"https:\/\/www.cozynotes.cz\/index.php\/2026\/06\/03\/tak-nam-schvalili-planovaci-smlouvu\/","title":{"rendered":"Tak n\u00e1m schv\u00e1lili pl\u00e1novac\u00ed smlouvu."},"content":{"rendered":"\n<p class=\"has-drop-cap\">Prezentuje se to jako v\u00fdhra, ale slovy jist\u00e9ho p\u00e1na je to sp\u00ed\u0161 takov\u00e1 nev\u00fdhra. Tedy, abyste mi rozum\u011bli, pl\u00e1novac\u00ed smlouva je dobr\u00fd n\u00e1stroj, ale p\u0159ich\u00e1z\u00ed po t\u00e9m\u011b\u0159 deseti letech a v podob\u011b, kter\u00e1 pro m\u011bsto nen\u00ed \u00fapln\u011b finan\u010dn\u011b skv\u011bl\u00e1. Pr\u016fmyslov\u00e1 z\u00f3na \u2013 p\u0159esn\u011bji \u0159e\u010deno logistick\u00e9 centrum Na P\u00edsk\u00e1ch m\u00e1 zelenou. Jen\u017ee p\u0159iznejme si, zelenou m\u00e1 u\u017e dlouho. Bezm\u00e1la jedno desetilet\u00ed vyjedn\u00e1v\u00e1n\u00ed, protest\u016f, referend a zm\u011bn vy\u00fastilo v\u010dera v souhlasn\u00e9 stanovisko v\u011bt\u0161iny zastupitel\u016f m\u011bsta s podobou pl\u00e1novac\u00ed smlouvy, jak ji p\u0159edlo\u017eil zastupitelstvem pov\u011b\u0159en\u00fd V\u00fdbor pro rozvoj pr\u016fmyslov\u00e9 z\u00f3ny.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"878\" src=\"https:\/\/www.cozynotes.cz\/wp-content\/uploads\/2026\/06\/Snimek-obrazovky-2026-06-03-164522-1024x878.png\" alt=\"\" class=\"wp-image-4866\" srcset=\"https:\/\/www.cozynotes.cz\/wp-content\/uploads\/2026\/06\/Snimek-obrazovky-2026-06-03-164522-1024x878.png 1024w, https:\/\/www.cozynotes.cz\/wp-content\/uploads\/2026\/06\/Snimek-obrazovky-2026-06-03-164522-300x257.png 300w, https:\/\/www.cozynotes.cz\/wp-content\/uploads\/2026\/06\/Snimek-obrazovky-2026-06-03-164522-768x658.png 768w, https:\/\/www.cozynotes.cz\/wp-content\/uploads\/2026\/06\/Snimek-obrazovky-2026-06-03-164522.png 1184w\" sizes=\"(max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><figcaption class=\"wp-element-caption\">Nab\u00eddka sob\u011bslavsk\u00e9 pr\u016fmyslov\u00e9 z\u00f3ny na webu czech-warehouses.com<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">\u0158et\u011bzen\u00ed chyb<\/h2>\n\n\n\n<p>\u0158et\u011bz chybn\u00fdch rozhodnut\u00ed zastupitel\u016f a radn\u00edch a nevysv\u011btliteln\u00e1 touha starosty, dnes ji\u017e b\u00fdval\u00e9ho, zapsat se do historie m\u011bsta t\u011b\u017ekou technikou a proudy kamion\u016f, byla na 20. zased\u00e1n\u00ed zastupitelstva m\u011bsta Sob\u011bslavi dota\u017eena do konce. Jak poznamenal velmi trefn\u011b b\u00fdval\u00fd zastupitel Martin K\u00e1kona v diskusi: \u201e<em>Omlouv\u00e1n\u00ed a relativizace chybn\u00fdch rozhodnut\u00ed vedlo k nov\u00fdm chybn\u00fdm rozhodnut\u00edm.<\/em>\u201c<\/p>\n\n\n\n<p>Jen n\u011bkte\u0159\u00ed zastupitel\u00e9 na\u0161li odvahu ten zhoubn\u00fd \u0159et\u011bzec pojmenovat a ozvat se. Po\u010d\u00edt\u00e1n\u00ed state\u010dn\u00fdch byste zvl\u00e1dli na prstech jedn\u00e9 ruky, smutn\u00fd fakt, kdy\u017e zastupitelstvo m\u011bsta tvo\u0159\u00ed 21 \u010dlen\u016f. V\u011bt\u0161ina zastupitel\u016f, minul\u00fdch a opakovan\u011b zvolen\u00fdch po t\u00e9m\u011b\u0159 t\u0159i funk\u010dn\u00ed obdob\u00ed ml\u010dela a nyn\u00ed si oddechla, kdy\u017e se vina polohlasem svalila v\u00edcem\u00e9n\u011b jen na b\u00fdval\u00e9ho starostu Jind\u0159icha Bl\u00e1hu. Jist\u011b, jeho pod\u00edl na z\u00f3n\u011b je lv\u00ed, ale pro\u010d se mu rada a zastupitel\u00e9 nepostavili d\u00e1vno? To zastupitel\u00e9 vol\u00ed a odvol\u00e1vaj\u00ed starostu, ne naopak.\u00a0\u00a0<\/p>\n\n\n\n<!--more-->\n\n\n\n<h2 class=\"wp-block-heading\">Cui bono?<\/h2>\n\n\n\n<p>Na po\u010d\u00e1tku byl chybn\u00fd prodej pozemk\u016f v situaci, kdy p\u0159edm\u011btn\u00e9 \u00fazem\u00ed nebylo dob\u0159e regulov\u00e1no \u00fazemn\u00edm pl\u00e1nem. Je \u00fapln\u011b jedno, jak velkou plochu m\u011bstsk\u00e9 pozemky tvo\u0159ily. I s jedn\u00edm pozemkem by toti\u017e \u0161lo dos\u00e1hnout mnohem v\u00edce. To je fakt! O to smutn\u011bj\u0161\u00ed je, kdy\u017e na v\u010derej\u0161\u00edm zastupitelstvu tu hloupou mantru o men\u0161in\u011b m\u011bstsk\u00fdch pozemk\u016f opakoval radn\u00ed Tom\u00e1\u0161 \u0160ena, diplomovan\u00fd technik \u2013 a\u010d s\u00e1m p\u0159edseda stavebn\u00ed komise m\u011bsta a nadto \u010dlen v\u00fdboru pro rozvoj pr\u016fmyslov\u00e9 z\u00f3ny!\u00a0<\/p>\n\n\n\n<p>M\u011bsto nav\u00edc v t\u00e9 dob\u011b (rok 2017) prod\u00e1valo pozemky pod cenou a\u017e o t\u0159etinu levn\u011bji, ne\u017e bylo obvykl\u00e9. Pr\u00fd to bylo pod vlivem krachu velk\u00fdch sob\u011bslavsk\u00fdch podnik\u016f (Jitona kon\u010dila 2011, Lada 2000) a obav zastupitel\u016f o rozvoj m\u011bsta. K tomu je dobr\u00e9 uv\u00e9st statistiku nezam\u011bstnanosti v on\u011bch letech: v roce 2013 dos\u00e1hla nejvy\u0161\u0161\u00ed hodnoty a sice 8,44 %, od t\u00e9 doby klesala. V osudn\u00e9m roce 2017 byla u\u017e na polovin\u011b \u00farovn\u011b roku 2013 &#8211; 4,24 %, tedy na \u00farovn\u00ed celost\u00e1tn\u00edho pr\u016fm\u011bru a o rok pozd\u011bji u\u017e spadla na 2,34 % (\u00fadaje dle MPSV k 31.12. p\u0159\u00edslu\u0161n\u00e9ho roku).<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Pl\u00e1novac\u00ed smlouva<\/h2>\n\n\n\n<p>Ale dost minulosti, zp\u011bt k pl\u00e1novac\u00ed smlouv\u011b. Institut pl\u00e1novac\u00ed smlouvy je dobr\u00fd a u\u017eite\u010dn\u00fd n\u00e1stroj regulace. Je jist\u011b super, \u017ee se poda\u0159ilo investora p\u0159im\u011bt k tomu, aby na smlouvu p\u0159istoupil. Probl\u00e9m je, za jak\u00fdch finan\u010dn\u00edch podm\u00ednek.<\/p>\n\n\n\n<p>Pl\u00e1novac\u00ed smlouva m\u011bstu nab\u00edz\u00ed mo\u017enosti regulace z\u00e1m\u011bru za podm\u00ednek, \u017ee se na jistou definovanou dobu vzd\u00e1 toho, aby investorovi h\u00e1zelo klacky pod nohy, obstruovalo a celkov\u011b mu komplikovalo \u017eivot. Pokud samoz\u0159ejm\u011b investor dodr\u017e\u00ed podm\u00ednky z\u00e1m\u011bru.<\/p>\n\n\n\n<p>Z\u00e1rove\u0148 pl\u00e1novac\u00ed smlouvy upravuj\u00ed finan\u010dn\u00ed p\u0159\u00edsp\u011bvek investora m\u011bstu. To je n\u00e1stroj, kter\u00fd m\u00e1 zajistit rozumn\u00fd rozvoj pot\u0159ebn\u00e9 infrastruktury a zm\u00edrnit negativn\u00ed dopady stavebn\u00edch z\u00e1m\u011br\u016f. Ty toti\u017e nevznikaj\u00ed ve vakuu, ale jsou sou\u010d\u00e1st\u00ed organismu m\u011bsta, ovlivn\u00ed nejen jeho vzhled, ale i funkce. U logistick\u00e9ho centra, kter\u00e9 u Sob\u011bslavi vznikne (ano, nem\u00e1 to b\u00fdt cel\u00fdch 100 % z\u00e1m\u011bru, bude to ale minim\u00e1ln\u011b polovina) to jsou na prvn\u00edm m\u00edst\u011b dopady na krajinu a potom zejm\u00e9na na dopravu, a tedy stav komunikac\u00ed, jejich zapln\u011bn\u00ed atd. atd. <\/p>\n\n\n\n<p>Nejde jen o j\u00edzdy do are\u00e1lu z\u00f3ny a ven, ale tak\u00e9 o st\u00e1n\u00ed n\u00e1kladn\u00edch vozidel v dob\u011b povinn\u00fdch p\u0159est\u00e1vek. Nov\u00e1 evropsk\u00e1 povinnost pro mezin\u00e1rodn\u00ed p\u0159epravu zav\u00e1d\u00ed tachografy a tedy p\u0159est\u00e1vky i pro vozidla nad 2,5 tuny v\u010detn\u011b p\u0159\u00edv\u011bsu. <\/p>\n\n\n\n<p>V p\u0159\u00edpad\u011b na\u0161eho m\u011bsta je jedn\u00edm ze z\u00e1sadn\u00edch dopad\u016f i vliv na m\u011bstskou \u010dist\u00edrnu odpadn\u00edch vod (\u010cOV). Ta toti\u017e pro z\u00e1m\u011br investora nebude kapacitn\u011b dosta\u010dovat a pot\u0159ebuje rekonstrukci a upgrade, jinak by to v podstat\u011b zablokovalo jak\u00fdkoli rozvoj m\u011bsta v oblasti bytov\u00e9 z\u00e1stavby.\u00a0\u00a0<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Dostaneme na novou \u010disti\u010dku&#8230;  n\u011bco&#8230;<\/h2>\n\n\n\n<p>A te\u010f po\u010d\u00edtadlo. \u00dapravy \u010cOV vyjdou podle odhad\u016f na \u010d\u00e1stku kolem 30-40 milion\u016f korun. P\u0159\u00edsp\u011bvek investora se po\u010d\u00edt\u00e1 podle navy\u0161ovan\u00e9 kapacity \u010cOV, kterou bude jeho z\u00e1m\u011br vy\u017eadovat. V p\u0159\u00edpad\u011b Sob\u011bslavi to vych\u00e1z\u00ed na 7 milion\u016f korun. Ty p\u016fjdou p\u0159\u00edmo do rozpo\u010dtu projektu nov\u00e9 (kapacitn\u011bj\u0161\u00ed) \u010cOV. Tady nen\u00ed moc co rozporovat, metodika je jasn\u00e1. Snad jen zm\u00edn\u00edm skute\u010dnost, \u017ee novou \u010cOV bude m\u011bsto muset nejd\u0159\u00edv platit ze sv\u00e9ho, prvn\u00ed pen\u00edze toti\u017e p\u0159ite\u010dou od investora a\u017e po povolen\u00ed jeho z\u00e1m\u011bru a bude na to m\u00edt p\u016fl roku.<\/p>\n\n\n\n<p>Celkem m\u00e1 investor na finan\u010dn\u00edm p\u0159\u00edsp\u011bvku m\u011bstu zaplatit 23 milion\u016f korun v \u010dasovan\u00fdch spl\u00e1tk\u00e1ch nav\u00e1zan\u00fdch na realizaci projektu. Zd\u00e1 se to jako slu\u0161n\u00fd ranec, ale\u2026<\/p>\n\n\n\n<p>U\u017e p\u0159i pohledu na n\u00e1klady na intenzifikaci \u010cOV vid\u00edme, \u017ee je po p\u0159\u00edsp\u011bvku, p\u0159\u00edjmy  (23) a n\u00e1klady (30-40) se vyru\u0161\u00ed, zbude pravd\u011bpodobn\u011b p\u0159evis na stran\u011b n\u00e1klad\u016f. Z\u00e1sadn\u00ed ale je, pod\u00edvat se, jak to s p\u0159\u00edsp\u011bvky vypad\u00e1 jinde. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">O kolik si vlastn\u011b m\u011bsta obvykle \u0159\u00edkaj\u00ed?<\/h2>\n\n\n\n<p>Lze op\u0159\u00edt o metodiky, inspirovat se. Mnoho m\u011bst a obc\u00ed toti\u017e zavedlo nebo zav\u00e1d\u00ed tzv. pravidla\/podm\u00ednky spolupr\u00e1ce s investory a jejich sou\u010d\u00e1st\u00ed jsou pl\u00e1novac\u00ed smlouvy a tyhle finan\u010dn\u00ed p\u0159\u00edsp\u011bvky. Stanovuj\u00ed se pau\u0161\u00e1lem podle m<sup>2<\/sup> zastav\u011bn\u00e9 plochy, \u0159\u00edk\u00e1 se tomu hrub\u00e1 podla\u017en\u00ed plocha. Tenhle pau\u0161\u00e1l se pak d\u00e1 r\u016fzn\u011b upravit pomoc\u00ed koeficientu v podob\u011b bonus\u016f nebo malus\u016f, podle toho, co m\u011bsto preferuje. Zjednodu\u0161en\u011b, kdy\u017e m\u00e1 stavba pro m\u011bsto p\u0159\u00ednosy, d\u00e1 se p\u0159\u00edsp\u011bvek pon\u00ed\u017eit, kdy\u017e je to stavebn\u00ed dinosaur p\u0159ev\u00e1\u017en\u011b m\u011bsto zat\u011b\u017euj\u00edc\u00ed, o sn\u00ed\u017een\u00ed nem\u016f\u017ee b\u00fdt \u0159e\u010d a n\u011bkde se \u010d\u00e1stky dokonce zvy\u0161uj\u00ed.<\/p>\n\n\n\n<p>A jak ten pau\u0161\u00e1l v \u010cesku vypad\u00e1 \u2013 pr\u016fm\u011br je n\u011bjak\u00fdch 900 K\u010d\/m<sup>2<\/sup>. A to bez ohledu na velikost m\u011bsta \u2013 jsou v tom jak velk\u00e1 krajsk\u00e1 m\u011bsta, tak obce se dv\u011bma tis\u00edci obyvateli nap\u0159\u00ed\u010d republikou.\u00a0<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">V Sob\u011bslavi op\u011bt za t\u0159etinu<\/h2>\n\n\n\n<p>Sob\u011bslav se rozhodla ten pr\u016fm\u011br st\u00e1hnout. A to po\u0159\u00e1dn\u011b! Jak\u00e1 ironie, \u017ee zhruba na t\u0159etinu. Stejn\u011b jako kdy\u017e m\u011bsto prod\u00e1valo v roce 2017 pozemky za t\u0159etinu obvykl\u00e9 ceny. Celkov\u00fd finan\u010dn\u00ed p\u0159\u00edsp\u011bvek m\u011bstu Sob\u011bslav je v pl\u00e1novac\u00ed smlouv\u011b po\u010d\u00edt\u00e1n pau\u0161\u00e1lem kolem 300 K\u010d\/m<sup>2<\/sup>.<\/p>\n\n\n\n<p>V\u00fdbor pr\u00fd vyjedn\u00e1val a navrhoval v\u00fdrazn\u011b vy\u0161\u0161\u00ed cenu, on\u011bch 23 milion\u016f pr\u00fd dohodl Jind\u0159ich Bl\u00e1ha z pozice b\u00fdval\u00e9ho starosty a v\u00fdbor ani rada pr\u00fd jaksi nem\u011bli s\u00edlu mu oponovat. Pro\u010d, kdy\u017e m\u011bli pov\u011b\u0159en\u00ed zastupitelstva k jedn\u00e1n\u00ed? B\u00fdval\u00fd starosta mohl m\u00edt samoz\u0159ejm\u011b svou kalkulaci p\u0159\u00edsp\u011bvku m\u011bstu, pokud ale v\u00fdbor skute\u010dn\u011b st\u00e1l o vy\u0161\u0161\u00ed finan\u010dn\u00ed p\u0159\u00edsp\u011bvek, m\u011bl se ozvat, a \u0159e\u0161it v\u011bc na zastupitelstvu, kter\u00e9 ho k jedn\u00e1n\u00ed s investorem pov\u011b\u0159ilo. M\u011bly se vyjasnit kompetence a postoj m\u011bsta vyj\u00e1d\u0159en\u00fd v\u016fl\u00ed zastupitel\u016f. T\u00edm, \u017ee st\u00e1vaj\u00edc\u00ed zastupitel\u00e9 a v\u00fdbor na tuhle nef\u00e9r hru b\u00fdval\u00e9ho starosty p\u0159istoupili, maj\u00ed i pod\u00edl viny na hanebn\u011b n\u00edzk\u00e9m finan\u010dn\u00edm p\u0159\u00edsp\u011bvku pro m\u011bsto. \u0158et\u011bzen\u00ed chyb, vzpom\u00edn\u00e1te?<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">M\u016f\u017ee za to&#8230;<\/h2>\n\n\n\n<p>\u017de se o Sob\u011bslavi mluvilo jako o m\u011bstu jednoho mu\u017ee bylo jist\u011b opr\u00e1vn\u011bn\u00e9, ale d\u016fle\u017eit\u00e9 je pochopit, \u017ee napoleonsk\u00e9 \u0159\u00edzen\u00ed m\u011bsta umo\u017e\u0148ovalo po dlouh\u00e1 l\u00e9ta zbyl\u00fdch \u0161est \u010dlen\u016f rady m\u011bsta a pochopiteln\u011b i zastupitel\u00e9, kte\u0159\u00ed hlasovali, jak bylo zrovna t\u0159eba. Deklarace v\u0161eobecn\u00e9 shody a n\u00e1lepkov\u00e1n\u00ed jak\u00e9hokoli n\u00e1znaku opozice si m\u011bsto mohlo zadl\u00e1\u017edit jako motto velk\u00fdmi p\u00edsmeny do plochy rekonstruovan\u00e9ho n\u00e1m\u011bst\u00ed.<\/p>\n\n\n\n<p>Nyn\u00ed m\u00e1me tvrd\u011b vyd\u0159enou (V\u00fdbor pro rozvoj pr\u016fmyslov\u00e9 z\u00f3ny odvedl kus pr\u00e1ce) pl\u00e1novac\u00ed smlouvu, ale netva\u0159me se pros\u00edm, \u017ee jsme n\u011bco vyhr\u00e1li a \u017ee za chyby m\u016f\u017ee jeden \u010dlov\u011bk, kter\u00fd nav\u00edc, asi dob\u0159e v\u011bd\u011bl, pro\u010d na dvac\u00e1t\u00e9m zased\u00e1n\u00ed zastupitelstva chyb\u011bl. Ve vyzn\u00e1n\u00ed vin se penitent vyzn\u00e1v\u00e1 nejen z toho, co ud\u011blal \u0161patn\u011b, ale i z toho, co ud\u011blat m\u011bl a neud\u011blal. Martin K\u00e1kona m\u011bl pravdu, pl\u00e1novac\u00ed smlouva je vpravd\u011b vyvrcholen\u00edm \u0159et\u011bzce nejen chybn\u00fdch rozhodnut\u00ed, ale tak\u00e9 alibismu a ne\u010dinnosti v\u011bt\u0161iny zastupitel\u016f a radn\u00edch posledn\u00edch t\u0159\u00ed funk\u010dn\u00edch obdob\u00ed. Nov\u00e1 rozhodnut\u00ed m\u011bla omlouvat a zakr\u00fdvat chyby t\u011bch p\u0159edchoz\u00edch. Je a\u017e s podivem, \u017ee se poda\u0159ilo pl\u00e1novac\u00ed smlouvy dos\u00e1hnout. P\u0159esto bude \u0161est hal, kter\u00e9 v dal\u0161\u00edch letech vyrostou nad m\u011bstem, smutnou p\u0159ipom\u00ednkou opakovan\u00fdch selh\u00e1n\u00ed v\u011bt\u0161iny sob\u011bslavsk\u00e9 politick\u00e9 reprezentace.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Nad\u011bje?<\/h2>\n\n\n\n<p>O napln\u011bn\u00ed v\u0161ech nekriticky optimistick\u00fdch v\u00fdhled\u016f o rozvoji m\u011bsta spojen\u00fdch s t\u00edmto investi\u010dn\u00edm z\u00e1m\u011brem pochybuju, douf\u00e1m ale, \u017ee se nenapln\u00ed ty velmi \u010dern\u00e9 sc\u00e9n\u00e1\u0159e. Cel\u00e1 kauza je\u0161t\u011b nekon\u010d\u00ed, bude t\u0159eba je\u0161t\u011b vyn\u011bt\u00ed ze zem\u011bd\u011blsk\u00e9ho p\u016fdn\u00edho fondu (bav\u00edme se o jakostn\u011b nekvalitn\u011bj\u0161\u00ed zem\u011bd\u011blsk\u00e9 p\u016fd\u011b), bude \u00fazemn\u00ed\/stavebn\u00ed \u0159\u00edzen\u00ed, bude realizace&#8230; Tam v\u0161ude je pot\u0159eba bd\u011blost.<\/p>\n\n\n\n<p> Snad ob\u010dan\u00e9 i zastupitel\u00e9 z toho v\u0161eho vyvod\u00ed odpov\u011bdnost a pou\u010d\u00ed se. K\u00e9\u017e i ta l\u00e9pe d\u00fdchateln\u00e1 atmosf\u00e9ra posledn\u00edho mimo\u0159\u00e1dn\u00e9ho zastupitelstva je p\u0159\u00edslibem, \u017ee v\u011bci jdou d\u011blat l\u00e9pe. Mnohem l\u00e9pe.\u00a0<\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Prezentuje se to jako v\u00fdhra, ale slovy jist\u00e9ho p\u00e1na je to sp\u00ed\u0161 takov\u00e1 nev\u00fdhra. Tedy, abyste mi rozum\u011bli, pl\u00e1novac\u00ed smlouva je dobr\u00fd n\u00e1stroj, ale p\u0159ich\u00e1z\u00ed po t\u00e9m\u011b\u0159 deseti letech a v podob\u011b, kter\u00e1 pro m\u011bsto nen\u00ed \u00fapln\u011b finan\u010dn\u011b skv\u011bl\u00e1. Pr\u016fmyslov\u00e1 z\u00f3na \u2013 p\u0159esn\u011bji \u0159e\u010deno logistick\u00e9 centrum Na P\u00edsk\u00e1ch m\u00e1 zelenou. Jen\u017ee p\u0159iznejme si, zelenou m\u00e1 &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/www.cozynotes.cz\/index.php\/2026\/06\/03\/tak-nam-schvalili-planovaci-smlouvu\/\" class=\"more-link\">Pokra\u010dovat ve \u010dten\u00ed<span class=\"screen-reader-text\"> &#8222;Tak n\u00e1m schv\u00e1lili pl\u00e1novac\u00ed smlouvu.&#8220;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[63],"tags":[],"_links":{"self":[{"href":"https:\/\/www.cozynotes.cz\/index.php\/wp-json\/wp\/v2\/posts\/4865"}],"collection":[{"href":"https:\/\/www.cozynotes.cz\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cozynotes.cz\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cozynotes.cz\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cozynotes.cz\/index.php\/wp-json\/wp\/v2\/comments?post=4865"}],"version-history":[{"count":2,"href":"https:\/\/www.cozynotes.cz\/index.php\/wp-json\/wp\/v2\/posts\/4865\/revisions"}],"predecessor-version":[{"id":4869,"href":"https:\/\/www.cozynotes.cz\/index.php\/wp-json\/wp\/v2\/posts\/4865\/revisions\/4869"}],"wp:attachment":[{"href":"https:\/\/www.cozynotes.cz\/index.php\/wp-json\/wp\/v2\/media?parent=4865"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cozynotes.cz\/index.php\/wp-json\/wp\/v2\/categories?post=4865"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cozynotes.cz\/index.php\/wp-json\/wp\/v2\/tags?post=4865"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}